SFH W


2020 | St. Egyden

Nominee, Houses of the year 2021

The two-storey new building, which is situated on a fair-faced concrete base, blends self-confidently into the gently sloping topography and reacts with its simple design language to the localized neighboring buildings. The clear design language is strengthened with the reduced choice of materials – untreated larch wood and exposed concrete.

Usage space: 170 m²
Beginning of planning: Sept 2017
Completion: June 2020
Construction time: 11 months

Photos: Markus Rohrbacher