SFH D


2021 | Hohenkammer near Munich

Award, Houses Award 2023
Award, Houses of the year 2022

A structure placed on concrete bulkheads reacts to the calculated flooding of the property in the event of a flood. The open ground floor zone, floating above the outdoor area, is zoned by a vertical access with air space and has a flowing transition to generously covered terraces. The surrounding, dense green space becomes the backdrop for everyday life.

Usage space: 285m²
Beginning of planning: Feb 2015
Completion: 2020
Construction time: 20 months

Photos: Albrecht Imanuel Schnabel